Field Note 006
FedRAMP VDR and VER Explained: What December 7 Requires
VDR and VER become mandatory on December 7, 2026. Here is what each ruleset asks you to do, in FedRAMP's own words, with the rule IDs.
Watch the video, or read it below · Published November 19, 2026 · Sources checked November 19, 2026
Watch the Short on YouTube · Watch the full landscape episode
VDR: VULNERABILITY DETECTION AND RESPONSE
- VDR-CSO-DET: systematically, persistently and promptly discover and identify vulnerabilities
- VDR-CSO-RES: track, evaluate, monitor, mitigate, remediate and report all detected vulnerabilities
- It "is NOT limited to traditional vulnerability scanning or testing"
- VDR-CSO-FAV: problems or failures with your detection and response processes are vulnerabilities
VER: VULNERABILITY EVALUATION AND REPORTING
- VER-EVA-ELX: is it likely exploitable?
- VER-EVA-EIR: is it internet-reachable?
- VER-EVA-EPA: Potential Agency Impact, rated N0 through N5
TIME FRAMES (VDR-TFR-PVR, worded SHOULD, counted from evaluation)
- Worst case (likely exploitable, internet-reachable, N5): Class A 4 days, Class B 4 days, Class C 2 days, Class D 12 hours
- Longest time frame in every class: 192 days
- VER-TFR-MAV (MUST): anything not fully mitigated or remediated within 192 days of evaluation is categorized as an accepted vulnerability
REPORTING
- VER-RPT-PER: report activity to all necessary parties persistently
- VER-TFR-MHR: human-readable report at least monthly
WHO AND WHEN
- All providers with FedRAMP Certifications of any type, 20x and Rev5. Agency-provided offerings are exempt (NTC-0017).
- Mandatory December 7, 2026. Grace period through March 7, 2027 under a corrective action plan (NTC-0014).
SOURCES (checked November 19, 2026)